principles projects CNMI-Guam old projects |
PAPartsOriginal Message -------- Subject: Status of Power Amplifiers Date: Tue, 9 Apr 2013 17:12:25 -1000 From: Alma Trujillo <acast@hawaii.edu> 1 TOMCO needs to be send to Australia to modify and or repair the temperature sensor (besides that its complete) 1 only needs checking and fixing the broken TOMCO 1 is completely done, only need checking, I will work this week to test them once I use the DNS 6 are almost done except for the parts missing which already talked to Mael and will be ordered (we need to fix the 3 RF input boxes which are not working) Edited 03/29/2013 Missing things to buy:
note that this is what's missing...it would be a good idea to order more than just that also lost somewhere in the lab:
things to be ordered for the completion of 6 PA: 50 Flat head screws (attach middle panel to the side of the PA) DONE 50 Round head screws (attach middle panel to the bottom of the PA) DONE 50 1" 1/2 inch 440 diameter screws (to attach the input board to the L shape) DONE 22" black cable DONE 4 Ethernet cables WE HAVE 20+ in stock (I put 6 @ ESF, the rest are in a box in 402) DONE 50 white pushup connectors (these are extremely important and are necessary for many connections between TOMCO, capacitor and relay) '''Source DigiKey. At one time I had the DK part number on the plastic box. No.12 black cable DONE 50 black grommets (these are the ones that go in the middle panel where the coaxial cables pass through) DONE 20 16 " coaxial cable for rabbit No.3 to input board DAVE? - Otherwise we have lots of stocks of SMAs & MCX cables in the lab; you can steal some of a close length (doesn't need to be exact) rather than doing a full order. We need a bunch! of MCX cables for the DDS boxes (DWH) DONE |