principles projects CNMI-Guam old projects |
MK3TXTestingMK-III transmitter testing Power up first tests LED Voltages Signals Equipment needed: multimeter, spectrum analyzer with 10 dB attenuator, or USB precision power meter; N to SMA and SMA to MCX cables, length 1 m; 100W 30 dB power attenuator + 20 dB safety attenuator 1. run radcelf_ini_cal.sh to set the RADCELF to calibration mode (no chirp, 80 Hz off) 2. proceed with calibration of CRX-8 LO-DISTRIB TX signal 3. install 100W 30 dB power attenuator on output of power amplifier 4. connect spectrum analyzer with 20+10 dB safety attenuator after the power attenuator 5. power up amplifier 6. connect the CRX-8 LO-DISTRIB TX signal to the input of the amplifier 7. adjust TX output level using blue potentiometer POT1 on LO-DISTRIB board again to match TOMCO BTM-250SA rated power of 50W or +47 dBm (or -13 dBm after the safety attenuators) TX output: 47 dBm @ 27 MHz 8. check harmonic levels of 2*f0 and 3*f0, must be less than f0 - 60 dB |